| Material | Aluminunum |
|---|---|
| Size | As Requirement |
| Shape | As Requirement |
| Heater | Water&Electric |
| Injection | Brass$Al |
| Packaging Details | Wood cages |
|---|---|
| Delivery Time | 7-10 days |
| Payment Terms | T/T, L/C |
| Supply Ability | 10 Pairs per week |
| Place of Origin | China,Beijing |
| Material | Al |
|---|---|
| Injection | Water &Elc Heating |
| Size | As Requirement |
| Shape | Various |
| Injecion | Al& Cu |
| Material | Al |
|---|---|
| Size | As Requirement |
| Use | Capsule And Paintball Production |
| Time | 3 Days |
| Express | Fedex,DHL.TNT |
| Material | Al |
|---|---|
| Size | As Requirement |
| Use | Capsule And Paintball Production |
| Time | 3 Days |
| Express | Fedex,DHL.TNT |
| Material | Avation Aluminium |
|---|---|
| Shape Design | Avaliable |
| Company | Factory |
| Manufacture Time | 5 Days |
| Warrantee | 1 Year |
| Material | AL Or Cu |
|---|---|
| Size | 4,6,8,10,12 Inch |
| Shipment | Fedex And DHL |
| Manufacture | CNC Center |
| Time | 3-5days |
| Material | AL Or Cu |
|---|---|
| Size | 4,6,8,10,12 Inch |
| Shipment | Fedex And DHL |
| Manufacture | CNC Center |
| Time | 3-5days |
| Material | AL Or Cu |
|---|---|
| Size | 4,6,8,10,12 Inch |
| Shipment | Fedex And DHL |
| Manufacture | CNC Center |
| Time | 3-5days |
| Material | Al/Cu |
|---|---|
| Size | 4-12 Inch |
| Design | Avaliable |
| Time | 7 Days |
| Shipment | Express |